Square Footage:
2,130 SF
Contract Type:
Bid/Spec - New Building and Site

Construction of a new Starbucks Coffee Building includes: brick and dryvit system on exterior, siding panels, aluminum canopies, windows, Drive-thru window and entry doors. Site development includes: clearing the site grading, drainage system and retention area, water and sewer connections, asphalt parking lot, sidewalks and sanitary sewer.

info@perrinconstructionco.com

8888 E Lansing Rd, Durand, Michigan 48429, USA

Licensed - Insured - Bonded

© 2020 Perrin Construction Company, Incorporated. All Rights Reserved. Website Design by Shumaker Technology Group